Dawes Road

Fulham

Brief:

The project was for a main contractor, located in the centre of Fulham with restricted access and complicated logistics.

Our works to demolition part of the existing basement so that the new basement structure could be formed. The project consistent of a 4 story RC frame thereafter.

• Demolition of the existing structure

• Design and installation of the complicated temporary works that had to be closely coordinate with the local highways authorise

• Underpinning to party walls.

• Construction of the new RC Basement structure.

• Construction of the new Podium groundfloor RC slab

• Construction of the new RC superstructure

• Design and installation a dual waterproofing scheme along with insurance backed warranty

23..jpg

Duration:

19 Weeks

Completed:

2019

Value:

£565,000

Scope:

RC Frames