TRAC Construction - Merrion Street, Leeds.png

MERRION STREET, LEEDS

CLIENT: HG Construction
TRAC VALUE: £8 million
COMPLETION: 2023

TRAC Construction have been appointed to carry out the excavation, drainage, sub-structure and super-structure including slip form to the 32 storey tower and 11 storey lower tower block in the heart of Leeds. The duration of the sub-contract package is running for approximately 78 weeks with over 12,000m3 of concrete making it one of the largest projects constructed within Leeds.

The scheme is for our long standing client and consists of two blocks which will deliver 660 student rooms to the local area.


This project also symbolises the expansion of TRAC from a company predominantly focusing on London and surrounding areas into national contractor with projects now across the UK.

EAST VILLAGE, LONDON

CLIENT: HG Construction
TRAC VALUE: £3 million
COMPLETION: May 2022

The seven storey concrete frame for this project was constructed over a period of 32 weeks with a completion in April 2022. 

This scheme, based in the London 2012 Athletes Village and is a key element to masterplan of the local area brining both affordable housing along with retail and community facilities.

TRAC's package consisted of excavation, drainage, lift core and a seven storey reinforced concrete frame.


 

DJI_0056.JPG

STIRLING ROAD, LONDON

CLIENT: Vision Construct
TRAC VALUE: £2.6 million
COMPLETION: 2022

TRAC Construction have been appointed to carry out the sub-contractor works to both high rise blocks  one sitting at 11 storeys and the other at 9 storeys, both of which are joined at ground level.

Scope of works include excavation, drainage, sub-structure and super-structure for a duration of 40 weeks.

 

CITY SQUARE, LEEDS

CLIENT: McAleer & Rushe
TRAC VALUE: £1.5 million
COMPLETION: 2023

Construction of the iconic office block in the heart of Leeds city centre will reach 12 storeys comprising of Grade A office space.

TRAC have been appointed to construct the lift core using slip form with our programme running for an estimated 14 weeks and is a stones throw from our major project on Merrion Street.

TRAC Construction - City Square, Leeds CGI.jpg
Princes-Parade-London.jpg

PRINCES PARADE, LONDON

CLIENT: Northvale
TRAC VALUE: £1.6 million
COMPLETION: 2021

The project was situated in North London with TRAC's scrope of works consisting of temporary propping, excavation, drainage, basement construction including waterproofing and a four storey concrete frame.

The project ran for approximately 38 weeks and was completed in the latter part of 2021.

 

ILFORD HIGH ROAD, LONDON

CLIENT: BOOM Construction
TRAC VALUE: £1.5 million
COMPLETION: 2022

The 11 storey building situated on Ilford High Road has started for our long standing client BOOM Construction which will run for a total of 26 weeks.

The scope of this scheme comprises of drainage, lift core and reinforced concrete frame s over 2500m3 and 320 tonne of reinforcement inclusive of crane hire.

 

BOOM - Ilford High Road - CGI 2.png
TRAC Construction - Ilderton Road, London.png

ILDERTON ROAD, LONDON

CLIENT: HG Construction
TRAC VALUE: £4.2 million
COMPLETION: 2023

TRAC Constructions package for this scheme in South East London consists of ground excavation, propping, basement construction, waterproofing & gas proofing, two blocks which comprise of 16 storeys and 13 storeys with a link between both buildings as well as associated lift cores to both blocks.

The works will run for just over 52 weeks and consist of over 8100m3 of concrete.


 

CANADA WATER, LONDON

CLIENT: HG Construction
TRAC VALUE: £5.4 million
COMPLETION: 2021

This project is one of our largest schemes constructed to date for our long standing client HG Construction, situated in South East London which run for just over a year.

The development comprises of three blocks of accommodation with an additional block for residential housing. The ground floor consisted of a mix of commercial and a health space.


 

Roslin Road

ROSLIN ROAD, LONDON

CLIENT: Vision Construct
TRAC VALUE: £2.6 million
COMPLETION: 2022

TRAC Construction are appointed as the specialist sub-contractor to carry out the excavation, drainage and RC frame to the Groundworks and 15 storey RC frame to Acton in West London

The total programme running for approximately 36 weeks with
625 tonne of reinforcement and over 3800m3 of concrete being delivered to the scheme.